Residential Thermal PerformanceDownload this information in a PDF file.

Fabric Energy Storage

Research work undertaken by the Cement and Concrete Association of New Zealand into the benefits of building a house from concrete is now complete and is the culmination of three distinct stages of work that was started in 1997. The work has confirmed that high mass construction is well suited to local conditions. Housing designs with expansive areas of glazing provide a key ingredient for deriving maximum benefit from thermal mass, i.e., high levels of thermal gain.

The findings of the research can be summarised as follows:

  • The amount of glazing, and its orientation to the sun, has a significant effect on the performance of a home.

  • The concrete building used 15.5% less energy than the identical timber one for similar comfort conditions.

  • The concrete house was more comfortable when a large window was fitted, the timber home overheated significantly.

  • The concrete home was more than 5PoPC cooler than ambient on a 30PoPC day, while the temperature inside the timber home approximated the outside temperature.

  • Overnight, the timber home was on average, 1 degree cooler than the concrete one.

  • The minimum temperatures for the concrete and timber buildings were 15.6PoPC and 12.8PoPC respectively.

  • The timber home required four times the shading needed by the concrete home (to control overheating).

Concrete has an inherent capacity (related to its mass) to absorb and store thermal energy. This quality is referred to as 'thermal mass'. Quite simply, concrete will absorb thermal energy, store it, and release it when the internal home temperature drops below that of the concrete.

This buffering effect means that the intermittent nature of heat sources such as space heaters and the sun becomes less apparent - temperature fluctuations are reduced and a more comfortable home is the result.

Summer

In summer, energy from direct sun and from warm circulating air is absorbed by the cooler concrete mass thus reducing the air temperature within the home. As the air temperature decreases in the evening, stored energy within the concrete mass re-radiates - providing consistent comfortable temperatures within the home.

This cooling effect of thermal mass is especially beneficial in very warm climates. Eaves should be designed to shade windows from high angled summer sun and there should be sufficient opening windows to allow cross ventilation.

Winter

Capturing the free energy of the sun is relatively simple with a concrete home. This energy is most efficiently captured if the sun shines directly onto existing concrete surfaces, although reflected radiation will also be absorbed by concrete surfaces not directly exposed to sunlight.

Convection and conduction also play a part. Solar gain can be achieved by maximising the glazing that faces north (± 20° off north is best) and using low insulation floor covering such as tiles on a concrete slab.

Carpet will insulate the concrete floor slab, which reduces its ability to absorb solar energy. Likewise plasterboard lining on concrete walls will reduce solar gain compared to hardwall plaster. Eaves and verandas should not prevent winter sun penetrating the glazing.


Thermal Performance Information courtesy of Cement & Concrete Association of New Zealand.

Wilco Precast News:



  • Preparations are already underway for Auckland’s 2018 Special Children’s Christmas Party on Saturday, 15 December, at the ASB Showgrounds. This event brings together over 2,000 sp.. read more »


  • Wilco sponsored Anita McLaren (nee Punt) during her 2016 Black Sticks Olympics campaign. Anita played her first match for New Zealand in June 2009 against India (https://en.wikipedia.org/wiki/Indi.. read more »

Another Wilco Precast project:

Bella Vista Apartments, Te Atatu

Architects:
Structural Engineers:
Building Contractor:
×

Britomart Transport Centre

Architects:
Structural Engineers:
Building Contractor:
×

Bruce Pullman Park, Papakura

Architects:
Structural Engineers:
Building Contractor:
×

Carlaw Park Student Accommodation

Architects:
Structural Engineers:
Building Contractor:
×

Ceres Building, Mt Wellington

Architects:



Structural Engineers:
Building Contractor:
×

Cinema, Pukekohe

Architects:



Structural Engineers:
Building Contractor:
×

City Gate, Hamilton

Architects:
Structural Engineers:
Building Contractor:
×

Counties East Area Headquarters

Architects:
Structural Engineers:
Building Contractor:
×

Diocesan School Centennial Building

Architects:
Structural Engineers:
Building Contractor:

Having used precast concrete on numerous other commercial and industrial projects the architects elected to use precast concrete as the principal cladding for the Centennial development to be able to provide a building appropriate to the traditions and qualities of Diocesan School.

It was clear from previous work already completed at the school, also a precast concrete building (the junior school) and from other buildings on site, that Diocesan would not be receptive to a building outside the established style, or to using some of the lighter weight cladding systems currently on offer. By careful consideration of panel size, joint location and the use of both horizontal and vertical rebates a virtually seamless building has been provided.

The use of the precast elements has also enabled modelling of the façade, creating deep recesses to the windows and the doors, and to provide cornices, projections and other details which provide an interesting pattern of shadows during the day, as the building follows the curve of the tree line.

The precast decorative columns to the perimeter extended through two levels and weighed up to 12 tonne each. They were capped off with curved precast feature beams up to 1500mm in depth. As the beams and columns included three-dimensional architectural features the detailed design, construction and placing of these components was absolutely critical in order to achieve the architect's final details.

The success of this major stage of the project was attributable to the attention to detail achieved by Wilco Precast, the engineers, architects and the construction team at Argon in putting together a high quality precast concrete structure. This was a working site with little construction space, requiring a high level of tolerance by all parties and the result is a credit to all concerned.

×

Foodtown, Takapuna

Architects:
Structural Engineers:
Building Contractor:
×

Housing Corp, Mt Albert

Architects:
GHD


Structural Engineers:
GHD


Building Contractor:
×

Ibis Hotel, Auckland Airport

Architects:
Structural Engineers:
Building Contractor:
×

Illico Apartments, Stonefields

Architects:
Structural Engineers:
Building Contractor:
×

KFC Auckland Airport

Architects:
Structural Engineers:



Building Contractor:
×

Kingsbridge Apartments, Remuera

Architects:
Structural Engineers:
Building Contractor:
×

Knox Street Car Park, Hamilton

Architects:
Structural Engineers:
Building Contractor:
×

Manukau Elective Surgical Hospital

Architects:
Structural Engineers:
Building Contractor:
×

Massey University Library, Albany

Architects:
Structural Engineers:
Building Contractor:
×

Massey University Student Accommodation

Architects:
Structural Engineers:
Building Contractor:
×

Merchant Quarter, New Lynn

Architects:
Structural Engineers:



Building Contractor:
×

Metlifecare Poynton, Takapuna

Architects:
Structural Engineers:
Building Contractor:
×

Mitre 10 Mega store, East Tamaki

Architects:
Structural Engineers:
Building Contractor:
×

Motorway Noisewalls

Architects:



Structural Engineers:



Building Contractor:


Litecrete noisewall barrier panels have many advantages over competing materials which can deteriorate, delaminate, lose strength, deflect and may not be able to withstand vehicular impacts. Installing Litecrete noisewall barrier panels is easy. Lifting eyes are set in the top edge of the panels during the casting process and once delivered to the construction site the panels are lifted up and slotted into the galvanised steel supports. Litecrete panels may be coloured by using integral colour pigments or by staining once the panels are installed. Textures or designs can be economically created on the traffic side or the residential side of the panels using rubber formliners.

×

New World, Mt Maunganui

Architects:
Structural Engineers:
Building Contractor:
×

NZI, Auckland

Architects:
Structural Engineers:
Building Contractor:
×

Reformed Church, Pukekohe

Architects:
Structural Engineers:
Building Contractor:
×

Saints Apartments, Auckland

Architects:
Structural Engineers:
Building Contractor:
×

Selwyn Retirement Village

Architects:
Structural Engineers:
Building Contractor:
×

Sentinel Apartments, North Shore

Architects:
Structural Engineers:
Building Contractor:
×

Sky City Casino

Architects:
Structural Engineers:
N/A


Building Contractor:
×

Sky City Grand Hotel Auckland City

Architects:
Structural Engineers:
Building Contractor:
×

Summerset Village, Flat Bush

Architects:
Structural Engineers:
Building Contractor:
×

Tauranga Police Station

Architects:
Structural Engineers:
Building Contractor:
×

Te Whare Wananga o Awanuiarangi, Whakatane

Architects:
Structural Engineers:
Building Contractor:
×

Trends Building, Ellerslie, Auckland

Architects:
Structural Engineers:
Building Contractor:
×

van den Brink Building, Manukau

Architects:
Structural Engineers:



Building Contractor:
×

Victoria Park Tunnel, Auckland

Architects:
Structural Engineers:



Building Contractor:
×

Vodafone Building, Auckland City

Architects:
Structural Engineers:
Building Contractor:
×

Westlake Girls High School

Architects:
Structural Engineers:
Building Contractor:
×

Wiri Correctional Centre, Auckland

Architects:



Structural Engineers:



Building Contractor:
×